Camella Renovation Estimates


Project Description:

Ceiling for 2nd floor, Dirty Kitchen, Aircon Housing, Bubble Insulation, With Double wall and Flush Door

Materials:

  1. Hardiflex Original ΒΌ for Ceiling and Walling
  2. Metal Furring
  3. C-channel
  4. Wall angle
  5. Metal Stud
  6. Blind Rivets
  7. Black screw
  8. Drill bit for Metal and Concrete
  9. Bubble Insulation (Heavy Duty)
  10. 4 pcs. Pin Lights
  11. Phelps dodge Wires, Flexible hose, Receptacle
  12. Flush Door
  13. Doorknob
  14. Hinges
  15. Angle bar
  16. Tie wire
  17. Air con outlet

Labor Works:

  • 2 Mason, 2 Labor, Carpenter, Electrician and Welder
    Total cost—————-Php 47,700

Comfort Room, Pagbabakbak ng lumang tiles, Pag-aalis ng Bowl and Lavatory at Pagkakabit ng Bagong Tiles


Materials:

  1. 30 x 60 cm Wall Siding Ceramic Tiles
  2. 30 x 30 cm Flooring Ceramic Tiles
  3. Adhesive
  4. Cement
  5. Sand
  6. Diamond Disk
  7. Silicon

Labor Works:

  • 2 Mason, 2 Labor and Plumber

Total cost————————–Php 46,800

Dirty Kitchen, 2 x 2 m, Walling( Inner plastered), Flooring and kitchen top tiles
Ceiling with Bubble Insulation and Exhaust
Materials:

  1. Hollow block de 5
  2. Sand
  3. Gravel
  4. Cement
  5. !0mm deformed bar, Tie wire
  6. Common nail, Plywood and 2x2x12 wood
  7. 2 x 2 x 1.5 Tubular
  8. Welding Rod
  9. Cutting Disk
  10. Rib type Colored Roof, Vulcaseal, Tekscrew, Type-S
  11. Plain sheet for Flashing
  12. Inside Gutter
  13. Downspout, PVC de 3 and Elbow
  14. Tiles flooring. Excluded ( for Additional)

Labor Works:

  • 2 Mason, 2 Labor, Welder and Latero
    Total cost————————-Php 60,600