House Renovation Sample Estimates

September 8, 2020

Dear Mr. and Mrs. Santos:

I am pleased to submit our detailed quotation for the Labor and Materials for the Renovation such as Tiles of two bedrooms, electrical works, and painting works.

  1. Materials for Flooring
  • 50 pcs. granite 60 x 60 ———————————————— Php 8, 750
  • 14 bags Cement holcim —————————————————- 3, 220
  • 2 bags Adhesive —————————————————————- 500
  • Bosun Diamond disk ———————————————————- 560
  • Sand ————————————————————————– 2, 500
  • Transportation —————————————————————– 500

Total: Php 16, 030

2. Paint materials

  • 6 gal. flat latex ———————————————————Php 3, 900
  • 6 gal. ready mix paint —————————————————– 4, 300
  • 5 gal. Enamel ————————————————————— 3, 500
  • Paint thinner ——————————————————————- 500
  • 4 Rollers ——————————————————————– 1, 300
  • 5 brushes ———————————————————————– 400
  • Tinting colors —————————————————————— 800
  • 2 Polituff ———————————————————————– 400
  • Punching compound and Skim coat ————————————- 1, 500
  • Transpo ————————————————————————- 200

Total: Php 16, 700

3. Electrical Materials

  • 12 pin lights ———————————————————– Php 6, 000
  • Wire flexible hose ——————————————————— 5, 000

Total: Php 11, 000

  1. Labor cost
  • 2 tiles setter ————————————————————– Php 650
  • 1 mason ———————————————————————— 650
  • 1 labor ———————————————————————— 400
  • 2 labor ————————————————————————– 400

11, 900

  • 2 painters ——————————————————————— 5, 200
  • Electrician ——————————————————————– 4, 500
  • Contractor ——————————————————————– 5, 000

Total: Php 26, 600

4. Terms of Payment

40% downpayment and remaining 60% progress billing

Summary:

  1. Material cost —————————————————- Php 43, 730
  2. Labor cost ————————————————————- 26, 600

Total Contract Price: Php 70, 300

Prepared by:

Jc Mer Herrera
Contractor / Project Engineer

Leave a Reply

Your email address will not be published. Required fields are marked *