September 8, 2020
Dear Mr. and Mrs. Santos:
I am pleased to submit our detailed quotation for the Labor and Materials for the Renovation such as Tiles of two bedrooms, electrical works, and painting works.
- Materials for Flooring
- 50 pcs. granite 60 x 60 ———————————————— Php 8, 750
- 14 bags Cement holcim —————————————————- 3, 220
- 2 bags Adhesive —————————————————————- 500
- Bosun Diamond disk ———————————————————- 560
- Sand ————————————————————————– 2, 500
- Transportation —————————————————————– 500
Total: Php 16, 030
2. Paint materials
- 6 gal. flat latex ———————————————————Php 3, 900
- 6 gal. ready mix paint —————————————————– 4, 300
- 5 gal. Enamel ————————————————————— 3, 500
- Paint thinner ——————————————————————- 500
- 4 Rollers ——————————————————————– 1, 300
- 5 brushes ———————————————————————– 400
- Tinting colors —————————————————————— 800
- 2 Polituff ———————————————————————– 400
- Punching compound and Skim coat ————————————- 1, 500
- Transpo ————————————————————————- 200
Total: Php 16, 700
3. Electrical Materials
- 12 pin lights ———————————————————– Php 6, 000
- Wire flexible hose ——————————————————— 5, 000
Total: Php 11, 000
- Labor cost
- 2 tiles setter ————————————————————– Php 650
- 1 mason ———————————————————————— 650
- 1 labor ———————————————————————— 400
- 2 labor ————————————————————————– 400
11, 900
- 2 painters ——————————————————————— 5, 200
- Electrician ——————————————————————– 4, 500
- Contractor ——————————————————————– 5, 000
Total: Php 26, 600
4. Terms of Payment
40% downpayment and remaining 60% progress billing
Summary:
- Material cost —————————————————- Php 43, 730
- Labor cost ————————————————————- 26, 600
Total Contract Price: Php 70, 300
Prepared by:
Jc Mer Herrera
Contractor / Project Engineer