Project Description:
Ceiling for 2nd floor, Dirty Kitchen, Aircon Housing, Bubble Insulation, With Double wall and Flush Door
Materials:
- Hardiflex Original ΒΌ for Ceiling and Walling
- Metal Furring
- C-channel
- Wall angle
- Metal Stud
- Blind Rivets
- Black screw
- Drill bit for Metal and Concrete
- Bubble Insulation (Heavy Duty)
- 4 pcs. Pin Lights
- Phelps dodge Wires, Flexible hose, Receptacle
- Flush Door
- Doorknob
- Hinges
- Angle bar
- Tie wire
- Air con outlet
Labor Works:
- 2 Mason, 2 Labor, Carpenter, Electrician and Welder
Total cost—————-Php 47,700
Comfort Room, Pagbabakbak ng lumang tiles, Pag-aalis ng Bowl and Lavatory at Pagkakabit ng Bagong Tiles
Materials:
- 30 x 60 cm Wall Siding Ceramic Tiles
- 30 x 30 cm Flooring Ceramic Tiles
- Adhesive
- Cement
- Sand
- Diamond Disk
- Silicon
Labor Works:
- 2 Mason, 2 Labor and Plumber
Total cost————————–Php 46,800
Dirty Kitchen, 2 x 2 m, Walling( Inner plastered), Flooring and kitchen top tiles
Ceiling with Bubble Insulation and Exhaust
Materials:
- Hollow block de 5
- Sand
- Gravel
- Cement
- !0mm deformed bar, Tie wire
- Common nail, Plywood and 2x2x12 wood
- 2 x 2 x 1.5 Tubular
- Welding Rod
- Cutting Disk
- Rib type Colored Roof, Vulcaseal, Tekscrew, Type-S
- Plain sheet for Flashing
- Inside Gutter
- Downspout, PVC de 3 and Elbow
- Tiles flooring. Excluded ( for Additional)
Labor Works:
- 2 Mason, 2 Labor, Welder and Latero
Total cost————————-Php 60,600