Sample Scope of Works for House Construction

Project Type: Two Storey Residential Structure
Project Cost: Php3,200,000.00 (Three Million and Two Hundred Thousand Pesos)

scope of works 2-storey

 

Scope of Works

I.    General Requirements                                         
a.    Mobilization, Materials Handling
a.    Site Clearing
b.    Temporary Facilities
c.    Demolition
d.    Excavation
e.    Demobilization
f.    Hauling

II.    Concrete Works                                                
a.    Foundation      (Excavation, Pouring of concrete, steel fabrications)   b.    Footing      (Excavation, pouring of concrete, steel fabrications)
c.    Wall Footing (Excavation, pouring of concrete, steel fabrications)
d.    Tie Beams (Excavation, formworks, pouring of concrete, steel fabrications)
e.    Columns (Formworks, scaffolding, pouring of concrete, steel fabrications)
f.    Beams (Formworks, scaffolding, pouring of concrete, steel fabrications)
g.    Roof Beams (Formworks, scaffolding, pouring of concrete, steel fabrications)
h.    Concrete Slab Works (Formworks, scaffolding, poring of concrete, steel fabrications)
i.    Canopies
j.    Counter Top

III.  Masonry Works                                
a.    CHB Laying and CHB reinforcements
b.    Brick Works (Limited to conservative finish)
c.    Stone Works (Limited to conservative finish)

IV.  Roofing and Tinsmitry                            
a.    Truss work
b.    Roofing Installations (.40mm thick Rib Type Roofing)
c.    Gutter Installations (Colored S-gutter)

V.   Finishing Works                                                       
a.    Plastering
b.    Ceiling Works ( Limited to conservative finish)
c.    Tile Works
-Ground Floor common areas (Granite Tiles .60x.60m)
-Toilet and Bath (.20x.30 and .20x.20m ceramic tiles)
-Counter Top (Granite Tiles .60x.60m)
-Laminated Flooring for al l rooms
-Second floor common areas (Granite Tiles .60x.60m)
d. Painting Works (Interior and exterior painting)
e. Carpentry works , Cabinets(Limited to conservative finish)
f. Doors (Panel and flush doors, aluminum framed sliding doors, hardware)
g. Windows (Aluminum framed sliding, awning and fixed windows)

XV.  Electrical Works
a.    Electrical rough-ins, power and lighting lines
b.    Main entrance, Panel board

XVI. Sanitary Works  
a.    Septic Vault
b.    Sanitary lines
c.    Installation of fixtures
d.    Storm drain

XVII. Plumbing Works    
a.    Cold Water line installations

Leave a Reply