Scope of Works:
- Mobilization
- Demolition
- Layout
- Masonry
- Electrical Works
- Steel works
- Painting Works
- Housekeeping
- Hauling of materials
Specification of materials:
1 . Rib type colored roof united pentagon 0.4mm thickness white or approved equal.
- Flashing gutter and gutter plain sheet united pentagon white or approved equal.
- C- purlins 2x3x1.5 and 2x6x1.5
- G.I pipe de 2 schedule 40
- Phelps dodge electrical wires and Panasonic wide series for switches.
- Install wiring for 6 pin light and 2 center light.
- Bubble insulation
- Metal furring , hardiflex ceiling plain design and painted.
Prepared by:
Engr. Jc Mer Lazo