Job Description:
Trusses and Roofing for second floor terrace
Materials:
Welding rod, cutting disk, insulation,15 pcs stainless gutter, 10 pcs flashing sheet, colored roofing rib type, tekscrew, Type-s, vulcaseal, drill bit, concrete nail, 5pcs 3.5 inches G.I pipe schedule 40, 30 pcs c-purlins 2x3x1.5, 8 pcs c-purlins 2x6x1.5, 30 pcs angle bar 2x2x4mm and 20 pcs angle bar 1.5x.5x3mm, electrical materials——————————————————— Php 235,000.00
Scope of Works:
- Hauling of materials
- Welding Works
- Masonry Works
- Electrical Works
- Painting Works
- Water Proofing
- Housekeeping
Total Labor Cost __________________________ Php 115,000.00
TOTAL MATERIAL AND LABOR COST —————————— Php 350,000.00