Trusses and Roofing for 2nd floor Terrace

Job Description:

Trusses and Roofing for second floor terrace

Materials:
Welding rod, cutting disk, insulation,15 pcs stainless gutter, 10 pcs flashing sheet, colored roofing rib type, tekscrew, Type-s, vulcaseal, drill bit, concrete nail, 5pcs 3.5 inches G.I pipe schedule 40, 30 pcs c-purlins 2x3x1.5, 8 pcs c-purlins 2x6x1.5, 30 pcs angle bar 2x2x4mm and 20 pcs angle bar 1.5x.5x3mm, electrical materials——————————————————— Php 235,000.00

Scope of Works:

  1. Hauling of materials
  2. Welding Works
  3. Masonry Works
  4. Electrical Works
  5. Painting Works
  6. Water Proofing
  7. Housekeeping

Total Labor Cost __________________________ Php 115,000.00

TOTAL MATERIAL AND LABOR COST —————————— Php 350,000.00