KITCHEN Renovation and Extension Estimates

Renovation of Kitchen, Extension and Swimming Pool

Project Description:

  1. Spandrel dirty kitchen ( 2ft x 23ft), gutter, down spout, flashing and demolition—Php 26,000
  2. Spandrel and flashing (182cm x 300 cm) in front of sliding door—17,000
  3. Spanderl Pasilyo ( 172 cm x 1170 cm) and demolition and electrical—-48,000
  4. Spandel garage ( 308 cm x 526 cm) and demolition——-43,000
  5. Swimming pool ( 3m x 4.4m ) —— 180,000

Note: Painting, granite , tiles are excluded

TOTAL CONTRACT COST: Php 340,000.00

Scope of Works:

  1. Mobilization
  2. Demolition
  3. Layout and excavation
  4. Masonry and Concrete Works
  5. Carpentry Works
  6. Electrical Works
  7. Steel works
  8. Roofing works
  9. Plumbing Works
  10. Housekeeping
  11. Hauling of materials

Trusses and Roofing for 2nd floor Terrace

Job Description:

Trusses and Roofing for second floor terrace

Materials:
Welding rod, cutting disk, insulation,15 pcs stainless gutter, 10 pcs flashing sheet, colored roofing rib type, tekscrew, Type-s, vulcaseal, drill bit, concrete nail, 5pcs 3.5 inches G.I pipe schedule 40, 30 pcs c-purlins 2x3x1.5, 8 pcs c-purlins 2x6x1.5, 30 pcs angle bar 2x2x4mm and 20 pcs angle bar 1.5x.5x3mm, electrical materials——————————————————— Php 235,000.00

Scope of Works:

  1. Hauling of materials
  2. Welding Works
  3. Masonry Works
  4. Electrical Works
  5. Painting Works
  6. Water Proofing
  7. Housekeeping

Total Labor Cost __________________________ Php 115,000.00

TOTAL MATERIAL AND LABOR COST —————————— Php 350,000.00

Two (2) Storey Eight (8) Door Apartment Estimates

Project Description:
Approximately with a total Square Meter of 559.86 sqm.
Garage with total sqm of 138 sqm.

Projected Estimate based on your Apartment Plan and Drawings:
Php 18,443,940.00
Labor Only:
Php 10,144,167.00

Apartment / House Features:
House elevation of 0.4 meter from the road
Tie beam
Spandrel
Stainless gutter
Granite flooring
Sliding windows UPVC
Screen doors
Grills and steel housing for aircon
Roof Insulation
Kitchen cabinet and built in cabinet
LED lights, Coblights and pinlights included
Interior
Stainless gutter 304
Metal furring and Hardiflex for ceiling
Steel trusses
PPR for plumbing
Boysen and Davies painting
Phelps Dodge electric wire, Koten breaker and panel koten
Panasonic switches and outlet wide series
Rib type United pentagon 0.5mm thick for roofing

MATERIAL SPECIFICATIONS:

I. Roofing
• Rib Type United Pentagon colored roof 0.5mm thickness
• Spandrel United Pentagon with ventilation
• Stainless gutter 304 cut 24

II. Steel Trusses
• 2x2x4mm angle bar top and bottom chord
• 1.5 x 1.5 x 3 mm angle bar for braces
• C-purlins 2x3x1.5 and 2x6x1.5
• Metal primer gray 3 gallons

III. Roof Insulation
• Bubbles insulation double sided heavy duty

IV. Ceiling
• Metal furring 0.5, C-channel 0.7 and wall angle
• Hardiflex 1/4 thickness
• Blind rivets and black screw

V. Electrical Materials
• Phelps dodge wire 2.0mm2 ,3.5mm2 and 5.5 mm2
• For main line number 6 phelps dodge
• Utility box, junction box, square box and PVC electrical conduit and flexible hose
• Panasonic wide series for switches and outlets
• Pinlights LED and coblights
• Receptacle and LED bulb for bedrooms, living rooms, kitchen and dirty kitchen
• Koten brand for panel and circuit breaker
• Outlet for CR heater

VI. Plumbing
• PPR Alasco for water line and PVC pipe S600 no. 4, 3, and 2 for sanitary and waste line
• Toilet bowl 2 set with telephone shower
• Exhaust fan for CR, kitchen and dirty kitchen
• Faucet 304

VII. Flooring
• Granite flooring 60×60 cm worth 185 pesos each superwhite MARIWASA
• Granite kitchen top 60x60cm worth 185 pesos each with outlet for rice cooker and small oven
• Ceramic tiles 30 x 60 cm for siding worth 90 pesos each with accent and 30 x30 cm ceramic rough tiles worth 40 pesos for flooring for CR

VIII. Carpentry Works
• Kitchen cabinet and hanging cabinets for kitchen
• Plyboard 3/4 for cabinet usage
• Hydraulic concealed hinges
• All cabinet with handle
• Drawer Guide with bearing heavy duty
• Painted

IX. Windows and Doors
• Light brown glasses
• Screen door for main and exit door UPVC
• Aluminum door for CR
• Solid doors for Main and Exit door (varnish)
• Flush Doors for bedrooms painted
• Concrete door jamps
• Faultless and Yale door knob

X. Garage
• Ceramic Tiles

XI. Window Grills
• Window grills square bars 12 mm standard and flat bars 1×1/4 or 3/4 tubular

XII. Soil Treatment
• Termite X or Approved Equivalent for flooring

XIII. Painting
• Boysen and Davies brand

Mode of Payment
40% Downpayment
Progress Billing Monthly

Project Duration:
More or less 250 days

Kitchen Renovation and Extension Estimates

KITCHEN renovation and Extension project

Scope of Works:

  1. Mobilization
  2. Demolition
  3. Layout and excavation
  4. Masonry and Concrete Works
  5. Carpentry Works
  6. Electrical Works
  7. Steel works
  8. Roofing works
  9. Plumbing Works
  10. Housekeeping
  11. Hauling of materials

Total contract amount============Php 340,000

Additional work:

  1. Spandrel dirty kitchen ( 2ft x 23ft), gutter, down spout, flashing and demolition—Php 26,000
  2. Spandrel and flashing (182cm x 300 cm) in front of sliding door——-17,000
  3. Spanderl Pasilyo ( 172 cm x 1170 cm) and demolition and electrical —–48,000
  4. Spandel garage ( 308 cm x 526 cm) and demolition ———- 43,000
  5. Swimming pool ( 3m x 4.4m ) —————-180,000
    Note: Painting, granite , tiles are excluded

Two Storey and Apartment Duplex Estimates

Project Description:


Duplex Apartment
First Unit
1st floor – 43.50 sqm floor area –
2nd floor – 45.10 sqm floor area
Total sqm floor area – 88.6 sqm total floor area

Second Unit
1st floor – 45.20 sqm floor area
2nd floor – 45.20 sqm floor area
Total sqm floor area – 90.4 sqm total floor area

Two Storey Residence House
1st floor – 52 sqm floor area
2nd floor – 52 sqm floor area
Total sqm floor area – 104 sqm total floor area

What to Include in the Contract?

  • Complete set of House Plan (plano)
  • Permits including Building permit, Electrical permit, Occupancy Permits
  • Quality Materials and Labor

House Features:
– House elevation of 0.5 meter from the road
– Tie beam
– Spandrel
– Stainless gutter
– Granite flooring
– Sliding windows
– Screen doors
– Grills and steel housing for aircon
– Roof Insulation
– Kitchen cabinet and built in cabinet
– LED lights, Coblights and pinlights included
– Interior
– Stainless gutter 304
– Metal furring and smart board for ceiling
– Steel trusses
– PPR for plumbing
– Boysen and Davies painting
– Philflex, Royu breaker koten and panel koten for electrical
– Panasonic switches and outlet
– Ribtype United pentagon 0.4mm thick for roofing

I. Roofing
• Rib Type United Pentagon colored roof 0.4mm thickness
• Spandrel United Pentagon with ventilation
• Stainless gutter 304 cut 24

II. Steel Trusses
• 2x2x3mm angle bar top and bottom chord
• 1.5 x 1.5 x 2.5mm angle bar for braces
• C-purlins 2x3x1.5 and 2x6x1.5
• Red oxide primer / Metal primer gray 3 gallons

III. Roof Insulation
• Bubbles insulation double sided heavy duty

IV. Ceiling
• Metal furring 0.5, C-channel and wall angle
• Smartboard 1/4 thickness
• Blind rivets and black screw

V. Electrical Materials
• Phelps dodge wire 2.0mm2 ,3.5mm2 and 5.5
• For main line number 6 phelps dodge
• Utility box, junction box, square box and PVC electrical conduit and flexible hose
• Panasonic classic series for switches and outlets
• Pinlights LED and coblights
• Receptacle and LED bulb for bedrooms, living rooms, kitchen and dirty kitchen
• Koten brand for panel and circuit breaker
• Outlet for CR heater

VI. Plumbing
• PPR Alasco for water line and PVC pipe S600 no. 4, 3, and 2 for sanitary and waste line
• Toilet bowl 2 set with telephone shower
• Exhaust fan for two (2) cr, kitchen and dirty kitchen
• Faucet 304

VII. Flooring
• Granite flooring 60×60 cm worth 150pesos each superwhite
• Granite kitchen top 60x60cm worth 150 pesos each with outlet for rice cooker and small oven
• Ceramic tiles 30 x 60 cm for siding worth 75 pesos each with accent and 30 x30 cm ceramic rough tiles worth 30 pesos for flooring for two(2) CR

VIII. Carpentry Works
• Kitchen cabinet and hanging cabinets for kitchen
• Plyboard 3/4 for cabinet usage
• Hydraulic concealed hinges
• All cabinet with handle
• Painted

IX. Windows and Doors
• Light brown glasses
• Screen door for main and exit door
• Aluminum door for CR
• Solid doors for Main and Exit door (varnish)
• Flush Doors for two(2) bedrooms painted
• Concrete door jamps
• Faultless door knob

X. Garage
• Tempered flooring rubberized paint

XI. Window Grills
• Window grills square bars 12 mm standard and flat bars 1×1/4

XII. Soil Treatment
• Termite X or Approved Equivalent for flooring

XIII. Painting
• Boysen and Davies brand

TOTAL CONTRACT PRICE


For Two Storey Residence with 90.4 sqm floor area
Php 2.496 M


For Duplex Apartment
First Unit – 88.6 sqm = Php 2,126 M
Second Unit – 90.4 sqm = Php 2,169 M

Mode of Payment


35% Downpayment
Progress Billing Monthly