KITCHEN Renovation and Extension Estimates

Renovation of Kitchen, Extension and Swimming Pool

Project Description:

  1. Spandrel dirty kitchen ( 2ft x 23ft), gutter, down spout, flashing and demolition—Php 26,000
  2. Spandrel and flashing (182cm x 300 cm) in front of sliding door—17,000
  3. Spanderl Pasilyo ( 172 cm x 1170 cm) and demolition and electrical—-48,000
  4. Spandel garage ( 308 cm x 526 cm) and demolition——-43,000
  5. Swimming pool ( 3m x 4.4m ) —— 180,000

Note: Painting, granite , tiles are excluded

TOTAL CONTRACT COST: Php 340,000.00

Scope of Works:

  1. Mobilization
  2. Demolition
  3. Layout and excavation
  4. Masonry and Concrete Works
  5. Carpentry Works
  6. Electrical Works
  7. Steel works
  8. Roofing works
  9. Plumbing Works
  10. Housekeeping
  11. Hauling of materials