Project Description:
Approximately with a total Square Meter of 559.86 sqm.
Garage with total sqm of 138 sqm.
Projected Estimate based on your Apartment Plan and Drawings:
Php 18,443,940.00
Labor Only:
Php 10,144,167.00
Apartment / House Features:
House elevation of 0.4 meter from the road
Tie beam
Spandrel
Stainless gutter
Granite flooring
Sliding windows UPVC
Screen doors
Grills and steel housing for aircon
Roof Insulation
Kitchen cabinet and built in cabinet
LED lights, Coblights and pinlights included
Interior
Stainless gutter 304
Metal furring and Hardiflex for ceiling
Steel trusses
PPR for plumbing
Boysen and Davies painting
Phelps Dodge electric wire, Koten breaker and panel koten
Panasonic switches and outlet wide series
Rib type United pentagon 0.5mm thick for roofing
MATERIAL SPECIFICATIONS:
I. Roofing
• Rib Type United Pentagon colored roof 0.5mm thickness
• Spandrel United Pentagon with ventilation
• Stainless gutter 304 cut 24
II. Steel Trusses
• 2x2x4mm angle bar top and bottom chord
• 1.5 x 1.5 x 3 mm angle bar for braces
• C-purlins 2x3x1.5 and 2x6x1.5
• Metal primer gray 3 gallons
III. Roof Insulation
• Bubbles insulation double sided heavy duty
IV. Ceiling
• Metal furring 0.5, C-channel 0.7 and wall angle
• Hardiflex 1/4 thickness
• Blind rivets and black screw
V. Electrical Materials
• Phelps dodge wire 2.0mm2 ,3.5mm2 and 5.5 mm2
• For main line number 6 phelps dodge
• Utility box, junction box, square box and PVC electrical conduit and flexible hose
• Panasonic wide series for switches and outlets
• Pinlights LED and coblights
• Receptacle and LED bulb for bedrooms, living rooms, kitchen and dirty kitchen
• Koten brand for panel and circuit breaker
• Outlet for CR heater
VI. Plumbing
• PPR Alasco for water line and PVC pipe S600 no. 4, 3, and 2 for sanitary and waste line
• Toilet bowl 2 set with telephone shower
• Exhaust fan for CR, kitchen and dirty kitchen
• Faucet 304
VII. Flooring
• Granite flooring 60×60 cm worth 185 pesos each superwhite MARIWASA
• Granite kitchen top 60x60cm worth 185 pesos each with outlet for rice cooker and small oven
• Ceramic tiles 30 x 60 cm for siding worth 90 pesos each with accent and 30 x30 cm ceramic rough tiles worth 40 pesos for flooring for CR
VIII. Carpentry Works
• Kitchen cabinet and hanging cabinets for kitchen
• Plyboard 3/4 for cabinet usage
• Hydraulic concealed hinges
• All cabinet with handle
• Drawer Guide with bearing heavy duty
• Painted
IX. Windows and Doors
• Light brown glasses
• Screen door for main and exit door UPVC
• Aluminum door for CR
• Solid doors for Main and Exit door (varnish)
• Flush Doors for bedrooms painted
• Concrete door jamps
• Faultless and Yale door knob
X. Garage
• Ceramic Tiles
XI. Window Grills
• Window grills square bars 12 mm standard and flat bars 1×1/4 or 3/4 tubular
XII. Soil Treatment
• Termite X or Approved Equivalent for flooring
XIII. Painting
• Boysen and Davies brand
Mode of Payment
40% Downpayment
Progress Billing Monthly
Project Duration:
More or less 250 days